+ Reply to Thread
Results 41 to 50 of 138
Thread: Build times!
-
4th May 2012, 02:45 PM #41Notebook Consultant
- Join Date
- Jan 2012
- Posts
- 176
- Rep Power
- 4
Re: Build times!
Sager NP9170 | I7-3720QM 2.6 | NVIDIA GTX 675M | Corsair Vengeance 16GB DDR3 1600 | Crucial 256GB M4 SSD | Seagate 750GB XT NCQ Hybrid | Bigfoot Networks Killer Wireless-N | 72% NTSC Matte Display | 6x Blu-Ray Burner | Cool Master U3
-
4th May 2012, 05:11 PM #42Notebook Geek
- Join Date
- Apr 2012
- Posts
- 79
- Rep Power
- 3
Re: Build times!
I got an email from Malibal earlier saying that theyve been out of 675m and the next shipment wont arrive until next week so theres that.

MALIBAL Lotus P150EM-SE
| 15.6" FHD LED Backlit Glossy w/ 95% color gamut | Intel Core i7 3610qm | NVIDIA GTX 675m | 16GB 1333MHz | 120GB OCZ Vertex III SSD |
-
4th May 2012, 06:05 PM #43Notebook Consultant
- Join Date
- Nov 2009
- Posts
- 243
- Rep Power
- 9
-
4th May 2012, 06:47 PM #44Notebook Consultant
- Join Date
- Jan 2012
- Posts
- 176
- Rep Power
- 4
Re: Build times!
Sager NP9170 | I7-3720QM 2.6 | NVIDIA GTX 675M | Corsair Vengeance 16GB DDR3 1600 | Crucial 256GB M4 SSD | Seagate 750GB XT NCQ Hybrid | Bigfoot Networks Killer Wireless-N | 72% NTSC Matte Display | 6x Blu-Ray Burner | Cool Master U3
-
4th May 2012, 08:52 PM #45Notebook Enthusiast
- Join Date
- Apr 2012
- Location
- Portage, MI
- Posts
- 31
- Rep Power
- 3
Re: Build times!
I'm on day 11 of a 5-12 day wait... I queried last Friday and Xotic said everything's good so far... I hope I don't get hit with a delay at this point without any notification thus far.
NP9150 - 3610QM, GTX 675M, 8GB 1600, Matte 95% Gamut, 6300 Ultimate-N

-
4th May 2012, 09:01 PM #46Notebook Enthusiast
- Join Date
- Apr 2012
- Posts
- 25
- Rep Power
- 3
Re: Build times!
I haven't heard anything yet about my order, which I suppose is a good thing.
No news is good news, right?
On a bum note, factoring in a 12 day build time and 4 day shipping to Xotic's place and then 4 day shipping to my place, I'm not going to see my laptop until the 22nd.
Bummer, but them's the breaks.
Can't wait, though. Luckily, I have a desktop for Diablo III. Here's hoping it gets here sooner than that, though, right?
-
4th May 2012, 09:02 PM #47Notebook Enthusiast
- Join Date
- Apr 2012
- Posts
- 25
- Rep Power
- 3
-
4th May 2012, 09:09 PM #48
Re: Build times!
Yeah, build times is something i'm really curious about. I'm getting mine with the 7970 and thats ETA-late may, and i'll be leaving the country for a 2month period on June 23rd, meaning i need it by the 22nd. But i find no purpose (for my gaming pedigree) to get anything but the 7970 so i'm in a bind! If the production happens fast enough i'll probably just boost the shipping to 3-day / Next-day depending on how time constricted i am.
here's to hoping!
Desktop: Intel 3570k @ 4.2ghz; Gigabyte Z77X-D3H; 8gb G.Skill DDR3 1600mhz; Galaxy 670 OC; OCZ Vertex 3 120gb; Seagate 750gb; Corsair HX 850w modular
Notebook: Sager NP9150, 3610QM; AMD 7970; Intel 520 180gb SSD; 8gb 1333mhz ram
-
4th May 2012, 09:57 PM #49Notebook Enthusiast
- Join Date
- Apr 2012
- Location
- Portage, MI
- Posts
- 31
- Rep Power
- 3
-
4th May 2012, 10:11 PM #50
Re: Build times!
Macbook Retina 13" | i7 2.9 GHz | 8Gb RAM | 256 Gb SSD |
Accessories - Steel Series Qck | Steel Series Sensei | Sennheiser IE80 w/ IE8i Custom Cables | HHKB Pro 2 | BenQ XL2420TX |



LinkBack URL





Reply With Quote

I`m upgrading, are you? (GTX 780M...
Yesterday, 10:10 PM in Gaming (Software and Graphics Cards)