Quantcast 1520 Ruby Red Waiting Room

Closed Thread
Page 1 of 22 1234511 ... LastLast
Results 1 to 10 of 213
  1. #1
    Notebook Consultant
    Join Date
    Aug 2007
    Location
    Charlotte, NC
    Posts
    187
    Rep Power
    15

    Us Ruby Red Waiting Room

    Who else is waiting for one? I still have no delays and have been told 3 times that It wont be delayed. But im not getting my hopes up.

    Well this is really old. Ive been delayed 2 times since I wrote this.

    Scratch that.... 5 times...
    Last edited by ThursdayLE; 2nd September 2007 at 04:05 PM. Reason: General Name

    DELL INSPIRON 1520
    Ruby Red

    C2D 2.0 GHZ
    2 Gig DDR2 677Mhz Ram
    Nvidia 8600M GT 256MB
    1280x900 WXGA Anti-Glare
    Order 7/25
    Build 7/25-
    Est. Ship 8/13
    Est. Arrival 8/14
    2nd Est. S 8/20
    3RD Est. S 8/28
    4TH Est. S 8/31
    5TH Est. S 9/9
    *6TH Est. S9/16
    BOXING 9/8
    SHIPPED 9/9

    RECIEVED 9/10

  2. #2
    Notebook Guru
    Join Date
    Jul 2007
    Posts
    67
    Rep Power
    15

    Default Re: 1520 Ruby Red Waiting Room

    yea i'm right next to ya. phone order status says build but i've been told by the dell folks the my order is on time. *sigh*

  3. #3
    Notebook Guru
    Join Date
    Jul 2007
    Posts
    69
    Rep Power
    15

    Default Re: 1520 Ruby Red Waiting Room

    Emailed this morning that mine is delayed till August 28 Told by phone this afternnon that there is a backorder of the ruby red covers.

  4. #4
    Notebook Enthusiast
    Join Date
    Jul 2007
    Posts
    14
    Rep Power
    15

    Default Re: 1520 Ruby Red Waiting Room

    Im waiting. I ordered the 31st and the ESD is Aug. 28th. I start school a week before that....... But oh well, I just hope it some how makes it through the mess before the ESD.

  5. #5
    Notebook Consultant
    Join Date
    Aug 2007
    Location
    Charlotte, NC
    Posts
    187
    Rep Power
    15

    Default Re: 1520 Ruby Red Waiting Room

    It almost seems like random orders are being shipped while those who have waited since june are getting screwed. I just hope Im one of those random lucky people.

    I wonder if they make the computers on weekends too...I would think.

    DELL INSPIRON 1520
    Ruby Red

    C2D 2.0 GHZ
    2 Gig DDR2 677Mhz Ram
    Nvidia 8600M GT 256MB
    1280x900 WXGA Anti-Glare
    Order 7/25
    Build 7/25-
    Est. Ship 8/13
    Est. Arrival 8/14
    2nd Est. S 8/20
    3RD Est. S 8/28
    4TH Est. S 8/31
    5TH Est. S 9/9
    *6TH Est. S9/16
    BOXING 9/8
    SHIPPED 9/9

    RECIEVED 9/10

  6. #6
    Newbie
    Join Date
    Aug 2007
    Posts
    4
    Rep Power
    0

    Ca Re: 1520 Ruby Red Waiting Room

    After reading these posts, I was getting freaked out. The waiting times, 3-4 weeks and some even more than a month. Well, somebodey must like me up there. Online ordered July 24th, made a quick change from Blue to Red finish and larger hard drive. Checked the status and it's been shipped! It's at the Purolator sorting plant in Toronto and it'll be here Monday the 13th, right on time!

    Order Dater July 24th
    Pre-Production Date July 26th
    Production Date July 26th
    Shipped Date August 8th

    Dell Inspiron 1520
    Intel® Core™ 2 Duo T5450 (2MB cache/1.66GHz/667Mhz FSB)
    Genuine Windows Vista™ Home Premium Edition
    Ruby Red Color with Microsatin Finish
    2GB Shared Dual Channel DDR2 SDRAM at 667MHz, 2 Dimm 2G2D
    120G 5400RPM SATA HDD
    IntelJ Graphics Media Accelerator X3000
    8X CD/DVD Burner (DVD+/-RW) with double-layer DVD+R
    IntelJ3945 802.11a/g Mini-card IP3945
    Integrated Sound Blaster Audigy HD
    Dell Wireless 355 Bluetooth Internal
    Dell Travel Remote Control
    $969.00 Canadian

    ** Plus $28 Costco Swiss Gear Notebook Case ** To Match

  7. #7
    Notebook Consultant
    Join Date
    Aug 2007
    Location
    Charlotte, NC
    Posts
    187
    Rep Power
    15

    Us Re: 1520 Ruby Red Waiting Room

    Quote Originally Posted by cooch View Post
    After reading these posts, I was getting freaked out. The waiting times, 3-4 weeks and some even more than a month. Well, somebodey must like me up there. Online ordered July 24th, made a quick change from Blue to Red finish and larger hard drive. Checked the status and it's been shipped! It's at the Purolator sorting plant in Toronto and it'll be here Monday the 13th, right on time!

    Order Dater July 24th
    Pre-Production Date July 26th
    Production Date July 26th
    Shipped Date August 8th

    Dell Inspiron 1520
    Intel® Core™ 2 Duo T5450 (2MB cache/1.66GHz/667Mhz FSB)
    Genuine Windows Vista™ Home Premium Edition
    Ruby Red Color with Microsatin Finish
    2GB Shared Dual Channel DDR2 SDRAM at 667MHz, 2 Dimm 2G2D
    120G 5400RPM SATA HDD
    IntelJ Graphics Media Accelerator X3000
    8X CD/DVD Burner (DVD+/-RW) with double-layer DVD+R
    IntelJ3945 802.11a/g Mini-card IP3945
    Integrated Sound Blaster Audigy HD
    Dell Wireless 355 Bluetooth Internal
    Dell Travel Remote Control
    $969.00 Canadian

    ** Plus $28 Costco Swiss Gear Notebook Case ** To Match
    Thats awsome dude! Im happy for ya...Seriously. Congrats on getting your laptop. Well...soon you will.

    I would scream and poop my pants if I were you. I just hope my laptop ships soon.

    DELL INSPIRON 1520
    Ruby Red

    C2D 2.0 GHZ
    2 Gig DDR2 677Mhz Ram
    Nvidia 8600M GT 256MB
    1280x900 WXGA Anti-Glare
    Order 7/25
    Build 7/25-
    Est. Ship 8/13
    Est. Arrival 8/14
    2nd Est. S 8/20
    3RD Est. S 8/28
    4TH Est. S 8/31
    5TH Est. S 9/9
    *6TH Est. S9/16
    BOXING 9/8
    SHIPPED 9/9

    RECIEVED 9/10

  8. #8
    Newbie
    Join Date
    Aug 2007
    Posts
    4
    Rep Power
    0

    Ca Re: 1520 Ruby Red Waiting Room

    Thanks! I noticed that our order and est. ship dates were close, I was looking to see if anyone was around the same time. It's just seems weird how some can get them in 2 weeks and others get them in 4 or more? Luck of the draw I guess!

    Hang tight....it shouldn't be much longer, Good luck!


    Dell Inspiron 1520
    Intel® Core™ 2 Duo T5450 (2MB cache/1.66GHz/667Mhz FSB)
    Genuine Windows Vista™ Home Premium Edition
    Ruby Red Color with Microsatin Finish
    2GB Shared Dual Channel DDR2 SDRAM at 667MHz, 2 Dimm 2G2D
    120G 5400RPM SATA HDD
    IntelJ Graphics Media Accelerator X3000
    8X CD/DVD Burner (DVD+/-RW) with double-layer DVD+R
    IntelJ3945 802.11a/g Mini-card IP3945
    Integrated Sound Blaster Audigy HD
    Dell Wireless 355 Bluetooth Internal
    Dell Travel Remote Control
    $969.00 Canadian

    ** Plus $28 Costco Swiss Gear Notebook Case ** To Match

  9. #9
    Notebook Enthusiast
    Join Date
    Jun 2007
    Posts
    16
    Rep Power
    15

    Default Re: 1520 Ruby Red Waiting Room

    Let's join the delayed order anonymous support group!
    Member of the delay club. Ordered a Sager notebook June 21, order delayed indefinitely..
    Waited a few more weeks, then cancelled July 18th.
    Ruby Red
    Inspiron 1520 notebook w/ 1680x1050
    2.0ghz Core 2 Duo
    2gb RAM, 160gb HDD, 8600gt, w/ webcam

    Ordered 7/18
    ESD: 8/6
    Delayed to: 8/28

  10. #10
    Notebook Evangelist
    Join Date
    Jul 2007
    Location
    New Jersey
    Posts
    401
    Rep Power
    16

    Default Re: 1520 Ruby Red Waiting Room

    still waiting for my ruby red as well. two backordered parts on my laptop.
    Dell Inspiron 1520 Ruby Red
    Intel Core 2 Duo T7300 (2.0GHz/800Mhz FSB/4MB cache)
    2GB 667MHz Dual Channel DDR2
    160GB (5400RPM) SATA HDD
    256MB NVIDIA GeForce Go 8600M GT
    15.4" High Resolution display (1440x900)
    Windows Vista Home Premium Edition

    Ordered July 9th
    Build from 7/9 - 8/13
    Boxing from 8/13 ---8/20
    SHIPPED 8/20
    Received 8/21!

 

 
Page 1 of 22 1234511 ... LastLast

Similar Threads

  1. Replies: 33
    Last Post: 8th November 2007, 11:17 PM
  2. Inspiron 1520 Crimson Red....Orders??
    By ThursdayLE in forum Dell Shipping Order Status and Customer Service Issues
    Replies: 31
    Last Post: 16th August 2007, 06:45 PM
  3. Replies: 11
    Last Post: 10th August 2007, 03:50 PM
  4. Has anyone gotten Ruby Red 1520 wsxga+ yet?
    By devsk in forum Dell Shipping Order Status and Customer Service Issues
    Replies: 0
    Last Post: 7th August 2007, 09:53 PM
  5. The Waiting Room
    By Wiggi in forum HP & Compaq
    Replies: 47
    Last Post: 11th September 2006, 02:14 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
All times are GMT -4. The time now is 01:10 AM.
Powered by vBulletin® Version 4.2.0
Copyright © 2013 vBulletin Solutions, Inc. All rights reserved.
SEO by vBSEO 3.6.0